Torvac Solution can provide you with an exhaustive fire system design for your residential, warehouse, office tower, restaurant or shopping centre project.  Torvac can undertake an audit on your existing fire system to determine your level of fire protection and compliance with Australian Standards, for new projects our experienced engineers can consult with the project stakeholders to recommend  the very best strategies for fire protection, with an in-depth understanding of systems such as fire detection, sprinklers, extinguishers, hose reels, hydrants and passive protection.

Our Fire System Design Process

Typically our fire system design process undertaken in 6 -7 stages (7 if a Fire System Audit is required for pre-existing Fire Systems)

Stage 1: Fire System Audit.

 Determine the System Category or level of protection.

Stage 2: Pre-Plan

Consulting with the project stakeholders is vital is essential for the best possible outcome. Determine the compliance with Australian Standards and local building codes as well as recommend the System Category or level of protection.

Stage 3: Detection and Alarm Zones

Propose the detection zones, and manual call points and confirm they comply with all local regulations. Alarm zones generally consist of numerous detection zones and are defined by the buildings compartment boundaries.

Stage 4: Positioning of Manual Call Points

In short, Manual Call points need to comply with Australian Standards and be above finished floor level, at easily accessible, well-illuminated and clearly visible. They should be mounted against a contrasting background for improved visibility .

Stage 5: Positioning of Sensors

Torvac will propose the right sensor for the appropriate application, that will provide the earliest warning of fire without the risk of a false alarm. Having a thorough understanding of buildings purpose will determine the location and types of sensors required.

Stage 6: Positioning Alarm sounders and Visual Alarms

Sounders and strobes are standard feature of a Fire protection System. It is important to firstly establish what evacuation procedure of the building will be, before deciding on the number and location of sounder/visual alarms. Torvac will establish the alarm zone areas where different alarm messages may be given, for example an alert or an evacuation tone.

Stage 7: Control Panel and Power Supply

The Control Panel and Power Supply must comply with Australian Standards and its designated positioned will be with the following considerations;

  • In an area of relatively low fire risk
  • On the ground floor entrance which the fire service will use
  • In buildings of multiple occupancy, the panel should be sited within a communal area
  • Visibly clear, unobstructed location.

From conception to completion, Torvac Solutions designs are built around your business’ specific needs. Torvac’s fire protection design ensures that you too understand the ins and outs of your fire protection system – with complete conceptual and final designs, budget breakdowns, and detailed installation documentation provided on completion.